PRACTICAL ACTIVITY 1

ROUTINE DECK MAINTENANCE

STUDENT NAME:.............................................

ACTIVITY  (extract of elements fromTDMMB4707A)

DATE

NOTES

Location, Partial Sign off, etc

Checks of deck surfaces are carried out in a planned maintenance system.

1a

Assignment 1   Link

Deterioration or corrosion of a vessel’s deck surfaces is identified & appropriate maintenance action initiated/carried out to a planned maintenance system.

1b

 

Painted surfaces faults and imperfections in are repaired correctly.

1c

 

Weathered surfaces are restored using cleaners and liquid abrasives in accordance with OH&S and pollution control requirements, planned maintenance procedures and manufacturer’s instructions

1d

 

Tools and equipment are correctly identified and used in accordance with OH&S requirements, company procedures and equipment manufacturer’s instructions

1e

 

Marine surfaces are prepared for the application of the required marine coating

1f

 

Maintenance materials are obtained, handled, prepared and to OH&S and pollution control requirements, procedures and manufacturer’s instructions

1g

 

Records of maintenance work carried out are completed correctly.

1h

 

Appropriate chemicals/cleaning/agents/equipment is selected to clean an area.

2a

 

Manufacturer’s warning and instructions regarding the use of chemicals and cleaning agents are read, understood and applied

2b

 

Cleaning tasks are completed in the assigned area in accordance with procedures and manufacturer’s instructions

2c

 

Chemicals, cleaning agents and equipment are correctly stored after use

2d

 

Paints and painting equipment for a particular surface are selected correctly with planned maintenance procedures and the paint manufacturer’s instructions.

3a

 

Marine paints are applied using appropriate application equipment in accordance with OH&S requirements, planned maintenance procedures and manufacturer’s instructions. Paint and painting equipment are correctly stored after use

3b, 3e

 

Problems in the application of paints are identified and reported and appropriate remedial action initiated

3c

 

Debris from maintenance activities is disposed of, or stored, in accordance with established procedures

3d

 

Tools and equipment for basic maintenance are correctly identified and used in accordance with OH&S requirements, planned maintenance procedures and equipment manufacturer’s instructions

4a

 

Maintenance materials are obtained/handled/prepared/applied in accordance with OH&S and pollution control requirements, company procedures and manufacturer’s instructions

ab

 

Defective deck fittings, equipment and systems are identified and reported, repaired and/or replaced as required by planned maintenance procedures

4c

 

Maintenance equipment is correctly cleaned and stored after use

4d

 

Debris and unused materials are disposed of or stored as per OH&S and pollution control requirements, planned maintenance procedures and manufacturer’s instructions

4e

 

PPE’s are used as per regulations and OH&S policy

5a

Assignment 2   Link

Maintenance hazards persons/ship/environment are identified and minimised.

5b

Assignment 3   Link

TDMMB4707A Perform routine remedial, preventative and survey deck maintenance on a vessel less than 80 metres

MARB004 Perform routine maintenance on a vessel up to 24 metres

These activities align to the TDM07 & MAR competencies at the time of publishing. Current and complete advice must be accessed through the http://training.gov.au/ website:

 

Witness Name, (Position, Qualification & contact details)……………… Signs…………………..

 

 

                             Student Signs…………………………  

 

Competent     Not yet Competent    Required, additional evidence of unit elements: